• About
  • Civil
  • Building
  • Contact
  • Plans & Specs
Menu

Inland Construction, Inc.

18172 Black Wolf Dr.
Abingdon, VA, 24211
276.676.2300

Your Custom Text Here

Inland Construction, Inc.

  • About
  • Civil
  • Building
  • Contact
  • Plans & Specs
photo 031.jpg

VA Creeper Trail Trestle 7 Replacement

Owner: Town of Abingdon, VA 

Engineer: Tysinger, Hampton & Partners

Description: - 2013-2014 - Construction of a new 454-foot timber railroad trestle on the Virginia Creeper Trail for the Town of Abingdon, VA.  This bridge replaced the original Trestle #7 that was destroyed during the tornado in 2011.  Work included grading, concrete footings and abutments, and timber framing to rebuild the trestle to a design similar to the original.

 

 

 

VA Creeper Trail Trestle 7 Replacement

Owner: Town of Abingdon, VA 

Engineer: Tysinger, Hampton & Partners

Description: - 2013-2014 - Construction of a new 454-foot timber railroad trestle on the Virginia Creeper Trail for the Town of Abingdon, VA.  This bridge replaced the original Trestle #7 that was destroyed during the tornado in 2011.  Work included grading, concrete footings and abutments, and timber framing to rebuild the trestle to a design similar to the original.

 

 

 

Christmas 2011 006.jpg
mike10.jpg
photo 006.jpg
photo 016.jpg
photo 031.jpg
Summary Block
This block is invalid. Please check the block settings and try again.
Featured
Aenean eu leo Quam

Powered by Squarespace                                      

Images provided on this website are for personal, non-commercial use. Republication, retransmission, or reproduction of such images is strictly prohibited.