• Civil Projects
  • Building Projects
  • Contact
  • Plans & Specs
Menu

Inland Construction, Inc.

18172 Black Wolf Dr.
Abingdon, VA, 24211
276.676.2300

Your Custom Text Here

Inland Construction, Inc.

  • Civil Projects
  • Building Projects
  • Contact
  • Plans & Specs
NRT IMG 4.jpg

New River Trail State Park Bridge Repairs

Owner: Virginia Department of Conservation and Restoration

Engineer: Prosim Engineering

Primary Subcontractor: F&B Contractors

Description: - 2023-2025 - Rehabilitation of 17 railroad bridges at New River Trail State Park from Fries/Galax, VA, to Pulaski, VA. Work included bridge carpentry to replace deck and handrail, and heavy substructure bridge repairs.

New River Trail State Park Bridge Repairs

Owner: Virginia Department of Conservation and Restoration

Engineer: Prosim Engineering

Primary Subcontractor: F&B Contractors

Description: - 2023-2025 - Rehabilitation of 17 railroad bridges at New River Trail State Park from Fries/Galax, VA, to Pulaski, VA. Work included bridge carpentry to replace deck and handrail, and heavy substructure bridge repairs.

NRT IMG 1.jpg
NRT IMG 2.jpg
NRT IMG 3.jpg
NRT IMG 4.jpg
NRT IMG 5.jpg
Summary Block
This block is invalid. Please check the block settings and try again.
Featured
Aenean eu leo Quam

Powered by Squarespace                                      

Images provided on this website are for personal, non-commercial use. Republication, retransmission, or reproduction of such images is strictly prohibited.